06 / Process

Six clear steps. One team for all of them.

A big backyard has a lot of moving parts. Our process keeps them in order, from the first conversation to the final walkthrough, so you always know what’s next.

Landscape crew setting large stone pavers and grading a backyard patio, with an excavator behind

The order matters

  • Listen
  • Measure
  • Design
  • Price
  • Build
  • Play

01The six steps

What happens, and what you get, at every step.

Each step ends with something you can hold on to, so decisions are easy and nothing is a surprise.

  1. 01

    Listen.

    Consultation

    We talk through how your family wants to use the yard, what’s on the wish list and the budget range you’re comfortable with.

    You get: A clear sense of what’s possible and the next step.

  2. 02

    Measure.

    Site visit

    We walk the property to understand size, slope, access, sun, existing utilities and what should stay.

    You get: Measurements and site notes the design is built on.

  3. 03

    Design.

    Master plan

    We design the whole backyard as one plan, placing every feature and showing options where choices matter.

    You get: A master plan you can react to and refine.

  4. 04

    Price.

    Proposal

    We price the plan in clear line items, so you can decide what to build now and what to phase later.

    You get: A written proposal and a schedule.

  5. 05

    Build.

    Construction

    We build in the right order: excavation and utilities before finished surfaces, with regular updates along the way.

    You get: One point of contact from groundbreaking to cleanup.

  6. 06

    Play.

    Walkthrough

    We walk the finished yard with you, explain care and maintenance, and make sure everything works.

    You get: Care notes for every feature and a team to call.

02What makes it work

The habits behind a smooth build.

Good process is mostly good habits, repeated on every project.

Sheet
Process
Habits
04
Applies to
Every build
  1. Phasing

    The master plan makes phasing safe. Build the court this year and the pool next, without redoing the work in between.

  2. Permits

    We identify what your city and HOA require during design, so approvals are part of the schedule, not a surprise.

  3. Updates

    Regular check-ins while we build, with one person who knows the whole project answering your questions.

  4. Respect

    A tidy site, protected landscaping and considerate neighbors. It’s your home while we work.

03Questions

Process questions.

How long does a whole backyard take?

It depends on scope, permitting and season. You get a schedule with your proposal, based on your actual plan.

Can we build in phases?

Yes. A master plan is what makes phasing work: each phase is built to fit the next one, so nothing gets torn out later.

Do we have to do everything at once?

No. Many families plan the whole yard and build the most-wanted pieces first. The plan keeps the rest ready for later.

What do you need from us to get started?

Just the consultation request. A rough wish list and an approximate budget range help, but we’ll work through the details together.

04Next step

Bring us the yard. We’ll bring the plan.

Tell us about your space, your family and your wish list. We’ll follow up to set up a design consultation.